Warship Feasibility Studies are highly complex projects. The thesis attempts to highlight the relevant factors inherent within industry and academia and then derives a methodology for managing early stage warship design. The initial data were gathered at the VT shipyard by interviewing key personnel. The collected data are then analysed using the MS Visio flowchart package to create input/output diagrams for all existing areas of work. Identifying explicit and implicit links allows the existing areas of work to be linked and inherent areas to be identified. The resulting connection diagrams are then analysed and compared with existing literature. The analysis results in the creation of several loops depicting the data flow during the assessment phase.
Two case studies are carried out to further refine the developed interface model. This model is further improved by carrying out in-depth investigations into previously neglected design factors. A series of algorithms are developed that can be used to determine balanced designs for corvettes and fast attack craft. These algorithms are used to identify factors and events that need extra attention during the design process. Different tools for managing the dataflow across the identified interfaces are researched and a set of control mechanisms is described in more detail. One mechanism, Margins, is further investigated using the developed algorithms in combination with knowledge obtained at VT to determine suitable margin ranges and applications.
The results from the interface analysis and interface management studies are combined to derive a management methodology, consisting of a project schedule, a set of functional flowcharts and an accompanying guidance manual. This methodology is tested and validated on a design study. The results from the validation are used to determine any required changes to the methodology. The developed methodology is found to provide an effective tool for managers and designers during the early stages of warship design in a defence environment.
Stratmann, Johannes Philipp
5e401540-824d-4ef8-ae05-17d0fe21a827
April 2006
Stratmann, Johannes Philipp
5e401540-824d-4ef8-ae05-17d0fe21a827
Wilson, P.A.
8307fa11-5d5e-47f6-9961-9d43767afa00
Molland, Anthony
917272d0-ada8-4b1b-8191-1611875ef9ca
Stratmann, Johannes Philipp
(2006)
Engineering management of early stage warship design.
University of Southampton, School of Engineering Sciences, Doctoral Thesis, 258pp.
Record type:
Thesis
(Doctoral)
Abstract
Warship Feasibility Studies are highly complex projects. The thesis attempts to highlight the relevant factors inherent within industry and academia and then derives a methodology for managing early stage warship design. The initial data were gathered at the VT shipyard by interviewing key personnel. The collected data are then analysed using the MS Visio flowchart package to create input/output diagrams for all existing areas of work. Identifying explicit and implicit links allows the existing areas of work to be linked and inherent areas to be identified. The resulting connection diagrams are then analysed and compared with existing literature. The analysis results in the creation of several loops depicting the data flow during the assessment phase.
Two case studies are carried out to further refine the developed interface model. This model is further improved by carrying out in-depth investigations into previously neglected design factors. A series of algorithms are developed that can be used to determine balanced designs for corvettes and fast attack craft. These algorithms are used to identify factors and events that need extra attention during the design process. Different tools for managing the dataflow across the identified interfaces are researched and a set of control mechanisms is described in more detail. One mechanism, Margins, is further investigated using the developed algorithms in combination with knowledge obtained at VT to determine suitable margin ranges and applications.
The results from the interface analysis and interface management studies are combined to derive a management methodology, consisting of a project schedule, a set of functional flowcharts and an accompanying guidance manual. This methodology is tested and validated on a design study. The results from the validation are used to determine any required changes to the methodology. The developed methodology is found to provide an effective tool for managers and designers during the early stages of warship design in a defence environment.
Text
Final_Thesis_JPS_.pdf
- Other
More information
Published date: April 2006
Organisations:
University of Southampton
Identifiers
Local EPrints ID: 142859
URI: http://eprints.soton.ac.uk/id/eprint/142859
PURE UUID: 5964a5d8-5698-4723-ba55-cbc122ada8c2
Catalogue record
Date deposited: 19 Aug 2010 11:01
Last modified: 14 Mar 2024 02:33
Export record
Contributors
Author:
Johannes Philipp Stratmann
Download statistics
Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.
View more statistics