Case study o the application of BPR in an SME contractor.
Riley, M.J. and Brown, D.C. (2001) Case study o the application of BPR in an SME contractor. Knowledge and Process Management., 8, (1), 17-28. (doi:10.1002/kpm.98).
Download
Full text not available from this repository.
Description/Abstract
The UK government strongly encouraged the construction industry to improve its efficiency during the 1990s. P Trant Limited, a medium-sized civil engineering contractor located in the south of England took on board this challenge and carried out a Business Process Re-engineering programme. This paper describes the process modelling tools used, the re-engineered processes and the efficiency gains produced. It is shown that mature medium-sized contracting companies can benefit from undertaking such a change programme and that the benefits are not restricted to large companies or groups. Copyright © 2001 John Wiley & Sons, Ltd.
| Item Type: | Article |
|---|---|
| ISSNs: | 1092-4604 (print) |
| Related URLs: | |
| Subjects: | T Technology > TH Building construction T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | University Structure - Pre August 2011 > School of Civil Engineering and the Environment |
| Item ID: | 53978 |
| Date Deposited: | 22 Jul 2008 |
| Last Modified: | 02 Mar 2012 11:49 |
| Contributors: | Riley, M.J. (Author) Brown, D.C. (Author) |
| Date: | February 2001 |
| Status: | Published |
| Contact Email Address: | mjr@soton.ac.uk |
| URI: | http://eprints.soton.ac.uk/id/eprint/53978 |
Actions (login required)
![]() |
View Item |