Browse by Divisions pre August 2011

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
[tool] Add To Shelf...
Number of items: 20.

Cheng, R.C.H. (2001) Analysis of Simulation Experiments by Bootstrap Resampling. In, Proceedings of the Winter Simulation Conference 2001. Winter Simulation Coference 2001 New York, USA, Institute of Electrical and Electronics Engineers, 179-186. (doi:10.1109/WSC.2001.977264).

Cheng, R.C.H. (2001) Analysis of simulation output by resampling. International Journal of Simulation, 1, (1-2), 51-58.

Cheng, R.C.H. and Liu, W.B. (2001) The consistency of estimators in finite mixture models. Scandinavian Journal of Statistics, 28, (4), 603-616. (doi:10.1111/1467-9469.00257).

Cheng, R.C.H., Melas, V.B. and Pepelyshev, A.N. (2001) Optimal designs for the evaluation of an extremum point. In, Atkinson, Anthony, Bogacka, Barbara and Zhigljavsky, Anatoly A. (eds.) Optimum Design 2000. Dordrecht, The Netherlands, Kluwer, 15-24. (Nonconvex Optimization and Its Applications, 51).

Ching, W.K. (2001) Iterative methods for queuing and manufacturing systems, London, GB, Springer, 160pp. (Springer Monographs in Mathematics).

Ching, Wai Ki (2001) Markovian approximation for manufacturing systems of unreliable machines in tandem. Naval Research Logistics, 48, (1), 65-78. (doi:10.1002/1520-6750(200102)48:1<65::AID-NAV4>3.0.CO;2-5).

Dontchev, Asen L., Qi, Houduo and Qi, Liqun (2001) Convergence of Newton's method for convex best interpolation. Numerische Mathematik, 87, (3), 435-456. (doi:10.1007/PL00005419).

Fliege, Joerg (2001) Approximation techniques for the set of efficient points. University of Dortmund, Germany, The University of Dortmund, Germany, 118pp.

Fliege, Jörg (2001) OLAF - A general modeling system to evaluate and optimize the location of an air polluting facility. OR Spectrum, 23, (1), 117-136. (doi:10.1007/PL00013342).

Fliege, Jörg and Fischer, Andreas (2001) Script zur vorlesung diskrete optimierung [Lecture notes on discrete optimization]. Dortmund, DE, University of Dortmund (Ergebnisberichte Angewandte Mathematik, 200T).

Gerodimos, A.E., Glass, C.A. and Potts, C.N. (2001) Scheduling of customised jobs on a single machine under item availability. IIE Transactions, 33, (11), 975-984.

Glass, C.A., Potts, C.N. and Strusevich, V.A. (2001) Scheduling batches with sequential job processing for two-machine flow and open shops. INFORMS Journal on Computing, 13, (2), 120-137. (doi:10.1287/ijoc.13.2.120.10521).

Hall, Nicholas G., Lesaoana, Maseka and Potts, Chris N. (2001) Scheduling with fixed delivery dates. Operations Research, 49, (1), 134-144. (doi: 10.1287/opre.49.1.134.11192).

Han, Qiaoming, Liao, Li-Zhi, Qi, Houduo and Qi, Liqun (2001) Stability analysis of gradient-based neural networks for optimization problems. Journal of Global Optimization, 19, (4), 363-381. (doi:10.1023/A:1011245911067).

Kashyrskikh, K.N., Potts, C.N. and Sevastianov, S.V. (2001) A 3/2-approximation algorithm for two-machine flow-shop sequencing subject to release dates. Discrete Applied Mathematics, 114, (1-3), 255-271. (doi:10.1016/S0166-218X(00)00374-7).

Kleijnen, Jack P.C., Cheng, Russell C.H. and Bettonvil, Bert (2001) Validation of trace-driven simulation models: bootstrap tests. Management Science, 47, (11), 1533-1538. (doi:10.1287/mnsc.47.11.1533.10255).

Liao, Li-Zhi, Qi, Houduo and Qi, Liqun (2001) Solving nonlinear complementarity problems with neural networks: a reformulation method approach. Journal of Computational and Applied Mathematics, 131, (1-2), 343-359. (doi:10.1016/S0377-0427(00)00262-4).

Possani, Edgar (2001) Lot streaming and batch scheduling: splitting and grouping jobs to improve production efficiency. University of Southampton, Department of Mathematics, Doctoral Thesis , 162pp.

Potts, C.N., Strusevich, V.A. and Tautenhahn, T. (2001) Scheduling batches with simultaneous job processing for two-machine shop problems. Journal of Scheduling, 4, (1), 25-51. (doi:10.1002/1099-1425(200101/02)4:1<25::AID-JOS58>3.0.CO;2-7).

Potts, C.N. and Whitehead, J.D. (2001) Workload balancing and loop layout in the design of a flexible manufacturing system. European Journal of Operational Research, 129, (2), 326-336. (doi:10.1016/S0377-2217(00)00230-7).

This list was generated on Wed Oct 22 01:42:04 2014 BST.