Seeking optimum project duration extensions

Seeking optimum project duration extensions
Seeking optimum project duration extensions
It is well-known that changes to a project's definition during the course of the project can cause significant disruption, and greatly extend a project's duration if no extra resources are committed to the project. However, it is also well-known that the opposite policy, of throwing as many resources as possible at the problem to try to keep to the original schedule, can be very expensive, and is often in fact counter-productive ($2000 hour). The underlying causes of the results for these two extreme policies are systemic, are often hard to quantify, and are often significantly under-estimated. This paper describes the system dynamics technique for modelling a project, using as a case-study a model drawn up for a delay and disruption claim; this model closely reflected the project both as budgetted and as actually occurred. It then shows how this model could be used to find an optimum trade-off between the two extreme policies, giving an optimal project extension.
project management, system dynamics
0160-5682
460-467
Williams, T.M.
fb409365-0027-4db3-b401-58a8c8992639
Williams, T.M.
fb409365-0027-4db3-b401-58a8c8992639

Williams, T.M. (1999) Seeking optimum project duration extensions. Journal of the Operational Research Society, 50 (5), 460-467.

Record type: Article

Abstract

It is well-known that changes to a project's definition during the course of the project can cause significant disruption, and greatly extend a project's duration if no extra resources are committed to the project. However, it is also well-known that the opposite policy, of throwing as many resources as possible at the problem to try to keep to the original schedule, can be very expensive, and is often in fact counter-productive ($2000 hour). The underlying causes of the results for these two extreme policies are systemic, are often hard to quantify, and are often significantly under-estimated. This paper describes the system dynamics technique for modelling a project, using as a case-study a model drawn up for a delay and disruption claim; this model closely reflected the project both as budgetted and as actually occurred. It then shows how this model could be used to find an optimum trade-off between the two extreme policies, giving an optimal project extension.

This record has no associated files available for download.

More information

Published date: 1999
Keywords: project management, system dynamics

Identifiers

Local EPrints ID: 36889
URI: http://eprints.soton.ac.uk/id/eprint/36889
ISSN: 0160-5682
PURE UUID: 323472be-02dd-405d-982f-5beb89372e07

Catalogue record

Date deposited: 23 Apr 2007
Last modified: 08 Jan 2022 18:57

Export record

Contributors

Author: T.M. Williams

Download statistics

Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.

View more statistics

Atom RSS 1.0 RSS 2.0

Contact ePrints Soton: eprints@soton.ac.uk

ePrints Soton supports OAI 2.0 with a base URL of http://eprints.soton.ac.uk/cgi/oai2

This repository has been built using EPrints software, developed at the University of Southampton, but available to everyone to use.

We use cookies to ensure that we give you the best experience on our website. If you continue without changing your settings, we will assume that you are happy to receive cookies on the University of Southampton website.

×