Single machine scheduling problem to maximize the number of early/tardy jobs with due windows
Single machine scheduling problem to maximize the number of early/tardy jobs with due windows
752-756
Wu, Y.
e279101b-b392-45c4-b894-187e2ded6a5c
Wang, D.
8c543acd-825f-4f34-948a-dcd2e289f0aa
1998
Wu, Y.
e279101b-b392-45c4-b894-187e2ded6a5c
Wang, D.
8c543acd-825f-4f34-948a-dcd2e289f0aa
Wu, Y. and Wang, D.
(1998)
Single machine scheduling problem to maximize the number of early/tardy jobs with due windows.
Proceedings of Chinese Control and Decision Academy Annual Conference, Zhangjiajie, China.
01 Jan 1998.
.
Record type:
Conference or Workshop Item
(Paper)
This record has no associated files available for download.
More information
Published date: 1998
Venue - Dates:
Proceedings of Chinese Control and Decision Academy Annual Conference, Zhangjiajie, China, 1998-01-01 - 1998-01-01
Identifiers
Local EPrints ID: 36967
URI: http://eprints.soton.ac.uk/id/eprint/36967
PURE UUID: 86af204a-8acf-472d-8f40-c27d3148aae8
Catalogue record
Date deposited: 26 Apr 2007
Last modified: 03 Dec 2023 02:39
Export record
Contributors
Author:
D. Wang
Download statistics
Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.
View more statistics