3D modelling of bored pile installation effects and long term monitoring of a propped retaining wall

3D modelling of bored pile installation effects and long term monitoring of a propped retaining wall
3D modelling of bored pile installation effects and long term monitoring of a propped retaining wall
In the last few decades much effort has been spent to investigate the installation effects of diaphragm wall panels in an overconsolidated deposit. Conversely, in the literature there is relatively little focus on the effects of bored pile construction. In this thesis a number of three dimensional finite difference analyses using FLAC3D have been carried out to investigate the stress changes and consequent movements due to bored pile and diaphragm wall installation in stiff clay. The three-dimensional numerical models developed to carry out these analyses were used to analyse, interpret and explain the instrumented data of ground stress changes during bored pile wall installation in an overconsolidated clay deposit in connection with the Channel Tunnel Rail Link (CTRL; now HS1) at Ashford. Two different soil models were implemented in the three dimensional finite difference analyses, having linear and non-linear stress strain characteristic. It was found that both analyses could capture the observed pattern of changes in stresses. Furthermore, it was found that the difference in stress changes and ground movements after a single pile or panel installation were primarily a consequence of the different geometry between pile and panel. In the literature, only limited research has been carried out to quantify the three dimensional effects of diaphragm wall installation. For this thesis a number of three dimensional finite difference analyses, using FLAC3D, were carried out, to investigate the installation effects of a group of panels in an overconsolidated clay deposit. One of the key uncertainties associated with the design of in situ embedded retaining walls in an overconsolidated deposit concerns the long-term horizontal stress acting on the wall. There is some concern that the high in situ horizontal stresses in an overconsolidated deposit may become re-established in the long-term, despite the reductions that occur during retaining wall installation and subsequent excavation in front of the wall. This thesis also presents long term case record from an embedded retaining wall that forms part of the Channel Tunnel Rail Link at Ashford, Kent, and a retaining wall at Coventry are also presented. Approximately 13 years of lateral stress monitoring around the embedded retaining wall at Ashford are presented and discussed. The long term field data shows that the in situ total horizontal stresses in the ground close to a retaining wall in an overconsolidated clay deposit did not re-establish in the long term
Montalti, L.
22811154-8b27-46eb-aa0e-fe088340c88f
Montalti, L.
22811154-8b27-46eb-aa0e-fe088340c88f
Powrie, W.
600c3f02-00f8-4486-ae4b-b4fc8ec77c3c

Montalti, L. (2015) 3D modelling of bored pile installation effects and long term monitoring of a propped retaining wall. University of Southampton, Engineering and the Environment, Doctoral Thesis, 273pp.

Record type: Thesis (Doctoral)

Abstract

In the last few decades much effort has been spent to investigate the installation effects of diaphragm wall panels in an overconsolidated deposit. Conversely, in the literature there is relatively little focus on the effects of bored pile construction. In this thesis a number of three dimensional finite difference analyses using FLAC3D have been carried out to investigate the stress changes and consequent movements due to bored pile and diaphragm wall installation in stiff clay. The three-dimensional numerical models developed to carry out these analyses were used to analyse, interpret and explain the instrumented data of ground stress changes during bored pile wall installation in an overconsolidated clay deposit in connection with the Channel Tunnel Rail Link (CTRL; now HS1) at Ashford. Two different soil models were implemented in the three dimensional finite difference analyses, having linear and non-linear stress strain characteristic. It was found that both analyses could capture the observed pattern of changes in stresses. Furthermore, it was found that the difference in stress changes and ground movements after a single pile or panel installation were primarily a consequence of the different geometry between pile and panel. In the literature, only limited research has been carried out to quantify the three dimensional effects of diaphragm wall installation. For this thesis a number of three dimensional finite difference analyses, using FLAC3D, were carried out, to investigate the installation effects of a group of panels in an overconsolidated clay deposit. One of the key uncertainties associated with the design of in situ embedded retaining walls in an overconsolidated deposit concerns the long-term horizontal stress acting on the wall. There is some concern that the high in situ horizontal stresses in an overconsolidated deposit may become re-established in the long-term, despite the reductions that occur during retaining wall installation and subsequent excavation in front of the wall. This thesis also presents long term case record from an embedded retaining wall that forms part of the Channel Tunnel Rail Link at Ashford, Kent, and a retaining wall at Coventry are also presented. Approximately 13 years of lateral stress monitoring around the embedded retaining wall at Ashford are presented and discussed. The long term field data shows that the in situ total horizontal stresses in the ground close to a retaining wall in an overconsolidated clay deposit did not re-establish in the long term

Text
__userfiles.soton.ac.uk_Users_slb1_mydesktop_PhD Luca Montalti.pdf - Other
Download (14MB)

More information

Published date: April 2015
Organisations: University of Southampton, Infrastructure Group

Identifiers

Local EPrints ID: 379748
URI: http://eprints.soton.ac.uk/id/eprint/379748
PURE UUID: 06e320b3-1d02-42b2-914e-79328c1ee03f
ORCID for W. Powrie: ORCID iD orcid.org/0000-0002-2271-0826

Catalogue record

Date deposited: 17 Aug 2015 10:49
Last modified: 15 Mar 2024 02:48

Export record

Contributors

Author: L. Montalti
Thesis advisor: W. Powrie ORCID iD

Download statistics

Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.

View more statistics

Atom RSS 1.0 RSS 2.0

Contact ePrints Soton: eprints@soton.ac.uk

ePrints Soton supports OAI 2.0 with a base URL of http://eprints.soton.ac.uk/cgi/oai2

This repository has been built using EPrints software, developed at the University of Southampton, but available to everyone to use.

We use cookies to ensure that we give you the best experience on our website. If you continue without changing your settings, we will assume that you are happy to receive cookies on the University of Southampton website.

×