Stakeholder perceptions of Environmental Management Plans as an environmental protection tool for major developments in the UK
Stakeholder perceptions of Environmental Management Plans as an environmental protection tool for major developments in the UK
Insufficient implementation and the lack of legislative requirements for follow-up measures following the approval of projects are consistently highlighted as major shortcomings of Environmental Impact Assessment (EIA). Although adopted over 15 years ago by the World Bank, Environmental Management Plans (EMPs) were only semi-formalised in the UK in 2008 and arguably provide a continuous link or ‘bridge’ between the EIA process pre-consent and an Environmental Management System (EMS) post-consent. Drawing on twenty-one semi-structured interviews with stakeholders and thematic analysis of their responses, and a broad-scale practitioner survey, this study aimed to assess the effectiveness of EMPs as an environmental protection tool across the project lifecycle for major developments. The findings revealed a mixed picture of EMP effectiveness in practice, with EMPs only partially fulfilling a bridging role between EIA and EMS. There is no ‘gold standard’ terminology for EMPs, all having slightly different uses, thus presenting different focuses to different stakeholders and further enhancing variation in practice. For many stakeholders, the effectiveness was simply not known, due to the lack of communication and follow-up that still exists. EMP–EMS linkages were shown to be effective from the developer's perspective when a single organisation has involvement across all project phases, though weaknesses occur when multiple parties are involved. Among other stakeholders, knowledge varied significantly; whilst some were in agreement that the linkages worked, many were unaware of the connections and thought of them as two quite separate tools. Stakeholders advocated for the need to make EMPs a legal requirement; for improved communication between stakeholders during EMP implementation and increased documentation of project outcomes; and for EMPs to be consistently written by environmental professionals. Furthermore, weak links in the current process may be improved by providing detailed guidance for organisations on the potential for EMP–EMS linkages, with the additional aim of encouraging stakeholders to broaden their current specialist knowledge on environmental protection tools.
60-71
Bennett, S.
2fd58f36-ee42-44d2-b27b-f0fe7c6c5c2c
Hudson, M.D.
1ae18506-6f2a-48af-8c72-83ab28679f55
Kemp, S.
942b35c0-3584-4ca1-bf9e-5f07790d6e36
January 2016
Bennett, S.
2fd58f36-ee42-44d2-b27b-f0fe7c6c5c2c
Hudson, M.D.
1ae18506-6f2a-48af-8c72-83ab28679f55
Kemp, S.
942b35c0-3584-4ca1-bf9e-5f07790d6e36
Bennett, S., Hudson, M.D. and Kemp, S.
(2016)
Stakeholder perceptions of Environmental Management Plans as an environmental protection tool for major developments in the UK.
Environmental Impact Assessment Review, 56, .
(doi:10.1016/j.eiar.2015.09.005).
Abstract
Insufficient implementation and the lack of legislative requirements for follow-up measures following the approval of projects are consistently highlighted as major shortcomings of Environmental Impact Assessment (EIA). Although adopted over 15 years ago by the World Bank, Environmental Management Plans (EMPs) were only semi-formalised in the UK in 2008 and arguably provide a continuous link or ‘bridge’ between the EIA process pre-consent and an Environmental Management System (EMS) post-consent. Drawing on twenty-one semi-structured interviews with stakeholders and thematic analysis of their responses, and a broad-scale practitioner survey, this study aimed to assess the effectiveness of EMPs as an environmental protection tool across the project lifecycle for major developments. The findings revealed a mixed picture of EMP effectiveness in practice, with EMPs only partially fulfilling a bridging role between EIA and EMS. There is no ‘gold standard’ terminology for EMPs, all having slightly different uses, thus presenting different focuses to different stakeholders and further enhancing variation in practice. For many stakeholders, the effectiveness was simply not known, due to the lack of communication and follow-up that still exists. EMP–EMS linkages were shown to be effective from the developer's perspective when a single organisation has involvement across all project phases, though weaknesses occur when multiple parties are involved. Among other stakeholders, knowledge varied significantly; whilst some were in agreement that the linkages worked, many were unaware of the connections and thought of them as two quite separate tools. Stakeholders advocated for the need to make EMPs a legal requirement; for improved communication between stakeholders during EMP implementation and increased documentation of project outcomes; and for EMPs to be consistently written by environmental professionals. Furthermore, weak links in the current process may be improved by providing detailed guidance for organisations on the potential for EMP–EMS linkages, with the additional aim of encouraging stakeholders to broaden their current specialist knowledge on environmental protection tools.
Text
pre publicationf Proof_EIR_5985.pdf
- Accepted Manuscript
More information
Accepted/In Press date: 18 September 2015
e-pub ahead of print date: 21 October 2015
Published date: January 2016
Organisations:
Civil Maritime & Env. Eng & Sci Unit
Identifiers
Local EPrints ID: 383206
URI: http://eprints.soton.ac.uk/id/eprint/383206
ISSN: 0195-9255
PURE UUID: 54d31989-cce3-43ee-9452-62ac119b6694
Catalogue record
Date deposited: 22 Oct 2015 14:34
Last modified: 15 Mar 2024 05:22
Export record
Altmetrics
Contributors
Author:
S. Bennett
Download statistics
Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.
View more statistics