Displacements ahead of an advancing NATM tunnel in the London clay

Displacements ahead of an advancing NATM tunnel in the London clay
Displacements ahead of an advancing NATM tunnel in the London clay
This paper reports the results of monitoring carried out to study the patterns of ground displacement that develop ahead of an advancing sprayed concrete lined tunnel in soft ground. Extensive instrumentation was installed and monitored during the construction of the Heathrow Express platform tunnels forming part of the underground station at London Heathrow's Terminal 4. The construction of the concourse tunnel, built between the two completed platform tunnels, provided the opportunity to install additional instrumentation ahead of the tunnel drive, and to measure ground movements as the tunnel approached the instrumented sections. The paper describes the ground conditions at Heathrow, and the method of construction used for the concourse tunnel. The performance of the instrumentation and the pattern of ground displacements measured are reported. Finally, a synthesis of ground displacements measured is given, and the results are compared with the volume loss recorded during the concourse tunnel construction.
tunnels, monitoring, field instrumentation, ground movements, case history
0016-8505
767-784
van der Berg, J.P.
40051846-d050-4a78-a348-9a093ae93720
Clayton, C.R.I.
8397d691-b35b-4d3f-a6d8-40678f233869
Powell, D.B.
78ad1aa4-32e5-4f0f-b3e4-06b6fd319be7
van der Berg, J.P.
40051846-d050-4a78-a348-9a093ae93720
Clayton, C.R.I.
8397d691-b35b-4d3f-a6d8-40678f233869
Powell, D.B.
78ad1aa4-32e5-4f0f-b3e4-06b6fd319be7

van der Berg, J.P., Clayton, C.R.I. and Powell, D.B. (2003) Displacements ahead of an advancing NATM tunnel in the London clay. Géotechnique, 53 (9), 767-784. (doi:10.1680/geot.53.9.767.37422).

Record type: Article

Abstract

This paper reports the results of monitoring carried out to study the patterns of ground displacement that develop ahead of an advancing sprayed concrete lined tunnel in soft ground. Extensive instrumentation was installed and monitored during the construction of the Heathrow Express platform tunnels forming part of the underground station at London Heathrow's Terminal 4. The construction of the concourse tunnel, built between the two completed platform tunnels, provided the opportunity to install additional instrumentation ahead of the tunnel drive, and to measure ground movements as the tunnel approached the instrumented sections. The paper describes the ground conditions at Heathrow, and the method of construction used for the concourse tunnel. The performance of the instrumentation and the pattern of ground displacements measured are reported. Finally, a synthesis of ground displacements measured is given, and the results are compared with the volume loss recorded during the concourse tunnel construction.

Text
39407-01.pdf - Version of Record
Restricted to Repository staff only
Request a copy

More information

Published date: November 2003
Keywords: tunnels, monitoring, field instrumentation, ground movements, case history
Organisations: Civil Engineering & the Environment

Identifiers

Local EPrints ID: 39407
URI: http://eprints.soton.ac.uk/id/eprint/39407
ISSN: 0016-8505
PURE UUID: 439fe383-d387-4fe0-bed4-13ab003bafa4
ORCID for C.R.I. Clayton: ORCID iD orcid.org/0000-0003-0071-8437

Catalogue record

Date deposited: 28 Jun 2006
Last modified: 16 Mar 2024 03:12

Export record

Altmetrics

Contributors

Author: J.P. van der Berg
Author: C.R.I. Clayton ORCID iD
Author: D.B. Powell

Download statistics

Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.

View more statistics

Atom RSS 1.0 RSS 2.0

Contact ePrints Soton: eprints@soton.ac.uk

ePrints Soton supports OAI 2.0 with a base URL of http://eprints.soton.ac.uk/cgi/oai2

This repository has been built using EPrints software, developed at the University of Southampton, but available to everyone to use.

We use cookies to ensure that we give you the best experience on our website. If you continue without changing your settings, we will assume that you are happy to receive cookies on the University of Southampton website.

×