Many of the world’s railways run on ballasted track, which has for nearly 200 years provided a stable support for train operation. However, with trafficking the geometry of the track deteriorates, mainly as a result of the development of differential settlement of the track-bed (ballast and sub-base). When the geometry defects become too severe, maintenance is needed to realign the track to enable the continued safe running of trains. Maintenance is a major cost associated with ballasted railway track, which usually takes the form of tamping. However, tamping damages the ballast, resulting in a diminishing return period between maintenance interventions until eventually the track-bed requires full renewal. A major component of the differential settlement can be attributed to the ballast layer. However, differential settlement of lengths of track cannot easily be modelled or predicted either computationally or experimentally. Thus the total plastic (permanent) settlement is often used as a proxy for the potential for the development of differential settlement along a length of track in the field. Many empirical models have been developed to predict ballast settlement, usually as a function of the number of train axle passes and/or the cumulative load. However, these models may produce very different results, perhaps indicating that the input variables have not been adequately formulated. This paper describes some current empirical ballast settlement models, and evaluates them using experimental data generated using the Southampton Railway Testing Facility (SRTF). This apparatus represents a section of track consisting of a single sleeper bay 650 mm wide, confined by rigid sides that enforce plane strain conditions. The paper summarises the strengths and weaknesses of the existing models, and suggests variables that could be taken into account to improve them.
999-1006
Abadi, Taufan
5e3abda7-80eb-4f39-921e-fae1f472d238
Le Pen, Louis
4a38e256-d113-4bba-b0d4-32d41995928a
Zervos, Antonios
9e60164e-af2c-4776-af7d-dfc9a454c46e
Powrie, William
600c3f02-00f8-4486-ae4b-b4fc8ec77c3c
4 September 2016
Abadi, Taufan
5e3abda7-80eb-4f39-921e-fae1f472d238
Le Pen, Louis
4a38e256-d113-4bba-b0d4-32d41995928a
Zervos, Antonios
9e60164e-af2c-4776-af7d-dfc9a454c46e
Powrie, William
600c3f02-00f8-4486-ae4b-b4fc8ec77c3c
Abadi, Taufan, Le Pen, Louis and Zervos, Antonios et al.
(2016)
A review and evaluation of ballast settlement models using results from the Southampton Railway Testing Facility (SRTF).
[in special issue: Advance in Transportation Geotechnics III]
Procedia Engineering, 143, .
(doi:10.1016/j.proeng.2016.06.089).
Abstract
Many of the world’s railways run on ballasted track, which has for nearly 200 years provided a stable support for train operation. However, with trafficking the geometry of the track deteriorates, mainly as a result of the development of differential settlement of the track-bed (ballast and sub-base). When the geometry defects become too severe, maintenance is needed to realign the track to enable the continued safe running of trains. Maintenance is a major cost associated with ballasted railway track, which usually takes the form of tamping. However, tamping damages the ballast, resulting in a diminishing return period between maintenance interventions until eventually the track-bed requires full renewal. A major component of the differential settlement can be attributed to the ballast layer. However, differential settlement of lengths of track cannot easily be modelled or predicted either computationally or experimentally. Thus the total plastic (permanent) settlement is often used as a proxy for the potential for the development of differential settlement along a length of track in the field. Many empirical models have been developed to predict ballast settlement, usually as a function of the number of train axle passes and/or the cumulative load. However, these models may produce very different results, perhaps indicating that the input variables have not been adequately formulated. This paper describes some current empirical ballast settlement models, and evaluates them using experimental data generated using the Southampton Railway Testing Facility (SRTF). This apparatus represents a section of track consisting of a single sleeper bay 650 mm wide, confined by rigid sides that enforce plane strain conditions. The paper summarises the strengths and weaknesses of the existing models, and suggests variables that could be taken into account to improve them.
Text
ICTG2016-Abadi et al-published.pdf
- Accepted Manuscript
More information
Accepted/In Press date: 26 February 2016
e-pub ahead of print date: 13 July 2016
Published date: 4 September 2016
Organisations:
Infrastructure Group
Identifiers
Local EPrints ID: 400739
URI: http://eprints.soton.ac.uk/id/eprint/400739
PURE UUID: 10059de6-70b1-48f4-b000-18381f689d0a
Catalogue record
Date deposited: 26 Sep 2016 08:34
Last modified: 15 Mar 2024 03:42
Export record
Altmetrics
Download statistics
Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.
View more statistics