Developing Integrated Tools to Optimise Railway systems: An overview
Developing Integrated Tools to Optimise Railway systems: An overview
This paper provides an overview of the DITTO (Developing Integrated Tools to Optimise) project and presents some of its initial findings. The aim of DITTO is to increase the practical capacity of railway systems by developing computerised tools that can determine the theoretical capacity of a given infrastructure, optimise timetables in the face of delays and optimise real-time traffic management in situation of both fixed block and moving block signalling. Some prototype tools are developed and applied to the East Coast Main Line (ECML) railway in the UK. In particular, a stochastic version of job shop scheduling is applied to the station of Peterborough. It is found that additional services can be provided on the local network but at the expense of service performance. However, when a wider network area is considered, the number of feasible additional services appears to be much reduced
Preston, Jonathan
ef81c42e-c896-4768-92d1-052662037f0b
Kovacs, Attila
2cbb97f8-fd1f-4fe2-b97c-3c20907a19bb
James, Phillip
fef98fa7-23fd-4da0-a276-493a5dee032e
Ye, Hongbo
0f03f364-c955-4a8f-8fe7-5d81665bfaaa
Preston, Jonathan
ef81c42e-c896-4768-92d1-052662037f0b
Kovacs, Attila
2cbb97f8-fd1f-4fe2-b97c-3c20907a19bb
James, Phillip
fef98fa7-23fd-4da0-a276-493a5dee032e
Ye, Hongbo
0f03f364-c955-4a8f-8fe7-5d81665bfaaa
Preston, Jonathan, Kovacs, Attila, James, Phillip and Ye, Hongbo
(2017)
Developing Integrated Tools to Optimise Railway systems: An overview.
7th International Conference on Railway Operations Modelling and Analysis, Congress Center "Lille Grand Palais", Lille, France.
04 - 07 Apr 2017.
22 pp
.
(In Press)
Record type:
Conference or Workshop Item
(Paper)
Abstract
This paper provides an overview of the DITTO (Developing Integrated Tools to Optimise) project and presents some of its initial findings. The aim of DITTO is to increase the practical capacity of railway systems by developing computerised tools that can determine the theoretical capacity of a given infrastructure, optimise timetables in the face of delays and optimise real-time traffic management in situation of both fixed block and moving block signalling. Some prototype tools are developed and applied to the East Coast Main Line (ECML) railway in the UK. In particular, a stochastic version of job shop scheduling is applied to the station of Peterborough. It is found that additional services can be provided on the local network but at the expense of service performance. However, when a wider network area is considered, the number of feasible additional services appears to be much reduced
Text
ICRORDITTOFeb2017_Final
- Accepted Manuscript
More information
Accepted/In Press date: 20 January 2017
Venue - Dates:
7th International Conference on Railway Operations Modelling and Analysis, Congress Center "Lille Grand Palais", Lille, France, 2017-04-04 - 2017-04-07
Organisations:
Transportation Group
Identifiers
Local EPrints ID: 406375
URI: http://eprints.soton.ac.uk/id/eprint/406375
PURE UUID: 85e6f942-8b6b-43fb-b827-6c182879eca7
Catalogue record
Date deposited: 10 Mar 2017 10:46
Last modified: 16 Mar 2024 05:03
Export record
Contributors
Author:
Attila Kovacs
Author:
Phillip James
Author:
Hongbo Ye
Download statistics
Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.
View more statistics