The University of Southampton
University of Southampton Institutional Repository

Managed Realignment: A Coastal Flood Management Strategy

Managed Realignment: A Coastal Flood Management Strategy
Managed Realignment: A Coastal Flood Management Strategy
This chapter contains sections titled:

Introduction

Setting Scheme Objectives

Selecting a Site for Realignment

Designing the Scheme

Obtaining Planning Approval and Consents

Undertaking the Construction Work

Monitoring and Evaluating Scheme Performance

Conclusions
Biodiversity Action Planning (BAP), Managed Realignment: A Coastal Flood Management Strategy, Monitoring and Evaluating Scheme Performance, Obtaining Planning Approval and Consents, Royal Society for the Protection of Birds (RSPB's), Selecting a Site for Realignment, Setting Scheme Objectives, Undertaking the Construction Work
60-86
Wiley-Blackwell
Townend, Ian
f72e5186-cae8-41fd-8712-d5746f78328e
Scott, Colin
a6a2c254-6b1e-470c-ab87-be3e0ce6215b
Dixon, Mark
9debc1f1-fae6-4ed4-a9b5-f080577c15fc
Pender, Gareth
Faulkner, Hazel
Townend, Ian
f72e5186-cae8-41fd-8712-d5746f78328e
Scott, Colin
a6a2c254-6b1e-470c-ab87-be3e0ce6215b
Dixon, Mark
9debc1f1-fae6-4ed4-a9b5-f080577c15fc
Pender, Gareth
Faulkner, Hazel

Townend, Ian, Scott, Colin and Dixon, Mark (2010) Managed Realignment: A Coastal Flood Management Strategy. In, Pender, Gareth and Faulkner, Hazel (eds.) Flood Risk Science and Management. Wiley-Blackwell, pp. 60-86. (doi:10.1002/9781444324846.ch4).

Record type: Book Section

Abstract

This chapter contains sections titled:

Introduction

Setting Scheme Objectives

Selecting a Site for Realignment

Designing the Scheme

Obtaining Planning Approval and Consents

Undertaking the Construction Work

Monitoring and Evaluating Scheme Performance

Conclusions

This record has no associated files available for download.

More information

Published date: 15 November 2010
Keywords: Biodiversity Action Planning (BAP), Managed Realignment: A Coastal Flood Management Strategy, Monitoring and Evaluating Scheme Performance, Obtaining Planning Approval and Consents, Royal Society for the Protection of Birds (RSPB's), Selecting a Site for Realignment, Setting Scheme Objectives, Undertaking the Construction Work

Identifiers

Local EPrints ID: 469426
URI: http://eprints.soton.ac.uk/id/eprint/469426
PURE UUID: 1f2a5378-5e62-4772-b1d5-ba63b34896d8
ORCID for Ian Townend: ORCID iD orcid.org/0000-0003-2101-3858

Catalogue record

Date deposited: 14 Sep 2022 16:50
Last modified: 06 Jun 2024 01:40

Export record

Altmetrics

Contributors

Author: Ian Townend ORCID iD
Author: Colin Scott
Author: Mark Dixon
Editor: Gareth Pender
Editor: Hazel Faulkner

Download statistics

Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.

View more statistics

Atom RSS 1.0 RSS 2.0

Contact ePrints Soton: eprints@soton.ac.uk

ePrints Soton supports OAI 2.0 with a base URL of http://eprints.soton.ac.uk/cgi/oai2

This repository has been built using EPrints software, developed at the University of Southampton, but available to everyone to use.

We use cookies to ensure that we give you the best experience on our website. If you continue without changing your settings, we will assume that you are happy to receive cookies on the University of Southampton website.

×