Decentralized subcontractor scheduling with divisible jobs
Decentralized subcontractor scheduling with divisible jobs
Subcontracting allows manufacturer agents to reduce completion times of their jobs and thus obtain savings. This paper addresses the coordination of decentralized scheduling systems with a single subcontractor and several agents having divisible jobs. Assuming complete information, we design parametric pricing schemes that strongly coordinate this decentralized system, i.e., the agents’ choices of subcontracting intervals always result in efficient schedules. The subcontractor’s revenue under the pricing schemes depends on a single parameter which can be chosen to make the revenue as close to the total savings as required. Also, we give a lower bound on the subcontractor’s revenue for any coordinating pricing scheme. Allowing private information about processing times, we prove that the pivotal mechanismis coordinating, i.e., agents are better off by reporting their true processing times, and by participating in the subcontracting. We show that the subcontractor’s maximum revenue with any coordinating mechanism under private information equals the lower bound of that with coordinating pricing schemes under complete information. Finally, we address the asymmetric case where agents obtain savings at differentrates per unit reduction in completion times. We show that coordinating pricing schemes do not always exist in this case
497–511
Hezarkhani, B.
ae3fc227-94dc-47bd-b52c-2fdf90277bef
Kubiak, W.
7020eb70-23e1-49f5-bc49-f743837523b4
1 October 2015
Hezarkhani, B.
ae3fc227-94dc-47bd-b52c-2fdf90277bef
Kubiak, W.
7020eb70-23e1-49f5-bc49-f743837523b4
Hezarkhani, B. and Kubiak, W.
(2015)
Decentralized subcontractor scheduling with divisible jobs.
Journal of Scheduling, 18 (5), .
(doi:10.1007/s10951-015-0432-2).
Abstract
Subcontracting allows manufacturer agents to reduce completion times of their jobs and thus obtain savings. This paper addresses the coordination of decentralized scheduling systems with a single subcontractor and several agents having divisible jobs. Assuming complete information, we design parametric pricing schemes that strongly coordinate this decentralized system, i.e., the agents’ choices of subcontracting intervals always result in efficient schedules. The subcontractor’s revenue under the pricing schemes depends on a single parameter which can be chosen to make the revenue as close to the total savings as required. Also, we give a lower bound on the subcontractor’s revenue for any coordinating pricing scheme. Allowing private information about processing times, we prove that the pivotal mechanismis coordinating, i.e., agents are better off by reporting their true processing times, and by participating in the subcontracting. We show that the subcontractor’s maximum revenue with any coordinating mechanism under private information equals the lower bound of that with coordinating pricing schemes under complete information. Finally, we address the asymmetric case where agents obtain savings at differentrates per unit reduction in completion times. We show that coordinating pricing schemes do not always exist in this case
Text
Decentralized_subcontractor_scheduling
- Version of Record
More information
e-pub ahead of print date: 2 June 2015
Published date: 1 October 2015
Identifiers
Local EPrints ID: 478347
URI: http://eprints.soton.ac.uk/id/eprint/478347
PURE UUID: 7a51c78b-eadb-4b39-b733-ff4467442378
Catalogue record
Date deposited: 28 Jun 2023 16:58
Last modified: 17 Mar 2024 04:21
Export record
Altmetrics
Contributors
Author:
B. Hezarkhani
Author:
W. Kubiak
Download statistics
Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.
View more statistics