An integrated multicriteria decision making methodology using compromise solution methods for prioritising risk of marine machinery systems

An integrated multicriteria decision making methodology using compromise solution methods for prioritising risk of marine machinery systems
An integrated multicriteria decision making methodology using compromise solution methods for prioritising risk of marine machinery systems

One of the most popular tools used for risk assessment of marine machinery systems is Failure Mode and Effect Analysis (FMEA). With this analysis tool, risk is represented in the form of a risk priority number (RPN) which is computed by multiplying the severity rating (S) by the occurrence probability (O) and the detection rating (D) for all failure modes of the system. This conventional FMEA has been criticised as having several limitations such as inability to aggregate imprecise ratings of multiple experts and inability to incorporate more than three risk criteria. These challenges have been addressed in this paper by developing two novel methodologies for prioritising the risk of failure modes for marine machinery systems. The first methodology integrates an averaging technique with VIKOR (Vlsekriterijumska Optimizacija Ikompromisno Resenje, meaning: Multicriteria Optimisation and Compromise Solution). The second methodology integrates an averaging technique with the Compromise Programming (CP) technique. While the averaging technique is applied as a means of aggregating imprecise risk criteria ratings from multiple experts, VIKOR and CP are used in the ranking of risk of failure modes. The applicability and suitability of these methodologies for risk prioritisation is demonstrated using two case studies.

Compromise Programming, Failure modes, FMEA, Marine machinery system, Risk criteria, VIKOR
0029-8018
92-103
Emovon, Ikuobase
e0a51526-6e06-4c29-ba98-6ea531cee694
Norman, Rosemary A.
6d2518aa-ece8-498f-82dc-dee5ec7b1b37
Murphy, Alan J.
8e021dad-0c60-446b-a14e-cddd09d44626
Pazouki, Kayvan
1e69a646-83da-49ce-af3a-c40808c83ffe
Emovon, Ikuobase
e0a51526-6e06-4c29-ba98-6ea531cee694
Norman, Rosemary A.
6d2518aa-ece8-498f-82dc-dee5ec7b1b37
Murphy, Alan J.
8e021dad-0c60-446b-a14e-cddd09d44626
Pazouki, Kayvan
1e69a646-83da-49ce-af3a-c40808c83ffe

Emovon, Ikuobase, Norman, Rosemary A., Murphy, Alan J. and Pazouki, Kayvan (2015) An integrated multicriteria decision making methodology using compromise solution methods for prioritising risk of marine machinery systems. Ocean Engineering, 105, 92-103. (doi:10.1016/j.oceaneng.2015.06.005).

Record type: Article

Abstract

One of the most popular tools used for risk assessment of marine machinery systems is Failure Mode and Effect Analysis (FMEA). With this analysis tool, risk is represented in the form of a risk priority number (RPN) which is computed by multiplying the severity rating (S) by the occurrence probability (O) and the detection rating (D) for all failure modes of the system. This conventional FMEA has been criticised as having several limitations such as inability to aggregate imprecise ratings of multiple experts and inability to incorporate more than three risk criteria. These challenges have been addressed in this paper by developing two novel methodologies for prioritising the risk of failure modes for marine machinery systems. The first methodology integrates an averaging technique with VIKOR (Vlsekriterijumska Optimizacija Ikompromisno Resenje, meaning: Multicriteria Optimisation and Compromise Solution). The second methodology integrates an averaging technique with the Compromise Programming (CP) technique. While the averaging technique is applied as a means of aggregating imprecise risk criteria ratings from multiple experts, VIKOR and CP are used in the ranking of risk of failure modes. The applicability and suitability of these methodologies for risk prioritisation is demonstrated using two case studies.

This record has no associated files available for download.

More information

Accepted/In Press date: 5 June 2015
e-pub ahead of print date: 3 July 2015
Published date: 3 July 2015
Additional Information: Funding Information: The authors would like to thank the Federal University of Petroleum Resources , Effurun, Nigeria for funding this research through TETFUND academic staff training intervention fund. They would also like to thank the School of Marine Science and Technology, Newcastle University, United Kingdom for providing the enabling environment for conducting this research.
Keywords: Compromise Programming, Failure modes, FMEA, Marine machinery system, Risk criteria, VIKOR

Identifiers

Local EPrints ID: 483825
URI: http://eprints.soton.ac.uk/id/eprint/483825
ISSN: 0029-8018
PURE UUID: 0fbb927d-a634-4638-90af-23aef6062a2e

Catalogue record

Date deposited: 06 Nov 2023 18:19
Last modified: 10 May 2024 17:03

Export record

Altmetrics

Contributors

Author: Ikuobase Emovon
Author: Rosemary A. Norman
Author: Alan J. Murphy
Author: Kayvan Pazouki

Download statistics

Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.

View more statistics

Atom RSS 1.0 RSS 2.0

Contact ePrints Soton: eprints@soton.ac.uk

ePrints Soton supports OAI 2.0 with a base URL of http://eprints.soton.ac.uk/cgi/oai2

This repository has been built using EPrints software, developed at the University of Southampton, but available to everyone to use.

We use cookies to ensure that we give you the best experience on our website. If you continue without changing your settings, we will assume that you are happy to receive cookies on the University of Southampton website.

×