An integrated scheduling problem of container handling equipment in the loading operations at automated container terminals
An integrated scheduling problem of container handling equipment in the loading operations at automated container terminals
Luo, Jiabin
33f52989-5cd7-4101-928c-dc78e6e3c027
Wu, Yue
e279101b-b392-45c4-b894-187e2ded6a5c
11 February 2013
Luo, Jiabin
33f52989-5cd7-4101-928c-dc78e6e3c027
Wu, Yue
e279101b-b392-45c4-b894-187e2ded6a5c
Luo, Jiabin and Wu, Yue
(2013)
An integrated scheduling problem of container handling equipment in the loading operations at automated container terminals.
AIA 2013-The 12th IASTED International Conference on<br/>Artificial Intelligence and Applications<br/>, , Innsbruck, Austria.
11 - 13 Feb 2013.
Record type:
Conference or Workshop Item
(Paper)
This record has no associated files available for download.
More information
Published date: 11 February 2013
Venue - Dates:
AIA 2013-The 12th IASTED International Conference on<br/>Artificial Intelligence and Applications<br/>, , Innsbruck, Austria, 2013-02-11 - 2013-02-13
Identifiers
Local EPrints ID: 485618
URI: http://eprints.soton.ac.uk/id/eprint/485618
PURE UUID: fa4bd3ab-a1b0-474c-aac8-36399500ae6b
Catalogue record
Date deposited: 12 Dec 2023 17:34
Last modified: 13 Dec 2023 02:38
Export record
Contributors
Author:
Jiabin Luo
Download statistics
Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.
View more statistics