Case study o the application of BPR in an SME contractor.


Riley, M.J. and Brown, D.C. (2001) Case study o the application of BPR in an SME contractor. Knowledge and Process Management, 8, (1), pp. 17-28. (doi:10.1002/kpm.98).

Download

Full text not available from this repository.

Description/Abstract

The UK government strongly encouraged the construction industry to improve its efficiency during the 1990s. P Trant Limited, a medium-sized civil engineering contractor located in the south of England took on board this challenge and carried out a Business Process Re-engineering programme. This paper describes the process modelling tools used, the re-engineered processes and the efficiency gains produced. It is shown that mature medium-sized contracting companies can benefit from undertaking such a change programme and that the benefits are not restricted to large companies or groups. Copyright © 2001 John Wiley & Sons, Ltd.

Item Type: Article
Digital Object Identifier (DOI): doi:10.1002/kpm.98
ISSNs: 1092-4604 (print)
Subjects:
ePrint ID: 53978
Date :
Date Event
February 2001Published
Date Deposited: 22 Jul 2008
Last Modified: 16 Apr 2017 17:48
Further Information:Google Scholar
URI: http://eprints.soton.ac.uk/id/eprint/53978

Actions (login required)

View Item View Item