Behaviour during construction of a stabilized base embedded retaining wall at Coventry
Behaviour during construction of a stabilized base embedded retaining wall at Coventry
Instrumentation has been installed to monitor the behaviour of a bored pile retaining wall with a stabilising base during and after its construction of the Coventry North-South Road scheme in Warwickshire. Wall movements, wall and base bending moments, loads in the temporary props, and vertical pressures beneath the permanent stabilising base were monitored. In this report, the ground conditions, construction sequence and instrumentation are described and the field measurements during construction and its first two years in service are discussed. The results are compared with a finite element back-analysis and outline recommendations made for the design of similar structures in the future. (A)
1846084458
Hayward, T.
819b5976-4ec7-4dfa-95e3-077683605a7c
Carder, D.
1024b810-4895-4bf0-bdc6-080f9b431c99
Powrie, W.
600c3f02-00f8-4486-ae4b-b4fc8ec77c3c
Richards, D.J.
a58ea81e-443d-4dab-8d97-55d76a43d57e
Barker, K.J.
b66e98ae-6060-489c-8282-c7545f09c30c
2000
Hayward, T.
819b5976-4ec7-4dfa-95e3-077683605a7c
Carder, D.
1024b810-4895-4bf0-bdc6-080f9b431c99
Powrie, W.
600c3f02-00f8-4486-ae4b-b4fc8ec77c3c
Richards, D.J.
a58ea81e-443d-4dab-8d97-55d76a43d57e
Barker, K.J.
b66e98ae-6060-489c-8282-c7545f09c30c
Hayward, T., Carder, D., Powrie, W., Richards, D.J. and Barker, K.J.
(2000)
Behaviour during construction of a stabilized base embedded retaining wall at Coventry
Wokingham, GB.
TRL
26pp.
Record type:
Monograph
(Project Report)
Abstract
Instrumentation has been installed to monitor the behaviour of a bored pile retaining wall with a stabilising base during and after its construction of the Coventry North-South Road scheme in Warwickshire. Wall movements, wall and base bending moments, loads in the temporary props, and vertical pressures beneath the permanent stabilising base were monitored. In this report, the ground conditions, construction sequence and instrumentation are described and the field measurements during construction and its first two years in service are discussed. The results are compared with a finite element back-analysis and outline recommendations made for the design of similar structures in the future. (A)
This record has no associated files available for download.
More information
Published date: 2000
Identifiers
Local EPrints ID: 75102
URI: http://eprints.soton.ac.uk/id/eprint/75102
ISBN: 1846084458
PURE UUID: 9ef83fb6-b595-4d4e-b8f9-def48e010ec2
Catalogue record
Date deposited: 11 Mar 2010
Last modified: 31 Jan 2024 02:34
Export record
Contributors
Author:
T. Hayward
Author:
D. Carder
Author:
K.J. Barker
Download statistics
Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.
View more statistics