The University of Southampton
University of Southampton Institutional Repository

Behaviour during construction of a stabilized base embedded retaining wall at Coventry

Behaviour during construction of a stabilized base embedded retaining wall at Coventry
Behaviour during construction of a stabilized base embedded retaining wall at Coventry
Instrumentation has been installed to monitor the behaviour of a bored pile retaining wall with a stabilising base during and after its construction of the Coventry North-South Road scheme in Warwickshire. Wall movements, wall and base bending moments, loads in the temporary props, and vertical pressures beneath the permanent stabilising base were monitored. In this report, the ground conditions, construction sequence and instrumentation are described and the field measurements during construction and its first two years in service are discussed. The results are compared with a finite element back-analysis and outline recommendations made for the design of similar structures in the future. (A)

1846084458
TRL
Hayward, T.
819b5976-4ec7-4dfa-95e3-077683605a7c
Carder, D.
1024b810-4895-4bf0-bdc6-080f9b431c99
Powrie, W.
600c3f02-00f8-4486-ae4b-b4fc8ec77c3c
Richards, D.J.
a58ea81e-443d-4dab-8d97-55d76a43d57e
Barker, K.J.
b66e98ae-6060-489c-8282-c7545f09c30c
Hayward, T.
819b5976-4ec7-4dfa-95e3-077683605a7c
Carder, D.
1024b810-4895-4bf0-bdc6-080f9b431c99
Powrie, W.
600c3f02-00f8-4486-ae4b-b4fc8ec77c3c
Richards, D.J.
a58ea81e-443d-4dab-8d97-55d76a43d57e
Barker, K.J.
b66e98ae-6060-489c-8282-c7545f09c30c

Hayward, T., Carder, D., Powrie, W., Richards, D.J. and Barker, K.J. (2000) Behaviour during construction of a stabilized base embedded retaining wall at Coventry Wokingham, GB. TRL 26pp.

Record type: Monograph (Project Report)

Abstract

Instrumentation has been installed to monitor the behaviour of a bored pile retaining wall with a stabilising base during and after its construction of the Coventry North-South Road scheme in Warwickshire. Wall movements, wall and base bending moments, loads in the temporary props, and vertical pressures beneath the permanent stabilising base were monitored. In this report, the ground conditions, construction sequence and instrumentation are described and the field measurements during construction and its first two years in service are discussed. The results are compared with a finite element back-analysis and outline recommendations made for the design of similar structures in the future. (A)

This record has no associated files available for download.

More information

Published date: 2000

Identifiers

Local EPrints ID: 75102
URI: http://eprints.soton.ac.uk/id/eprint/75102
ISBN: 1846084458
PURE UUID: 9ef83fb6-b595-4d4e-b8f9-def48e010ec2
ORCID for W. Powrie: ORCID iD orcid.org/0000-0002-2271-0826

Catalogue record

Date deposited: 11 Mar 2010
Last modified: 31 Jan 2024 02:34

Export record

Contributors

Author: T. Hayward
Author: D. Carder
Author: W. Powrie ORCID iD
Author: D.J. Richards
Author: K.J. Barker

Download statistics

Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.

View more statistics

Atom RSS 1.0 RSS 2.0

Contact ePrints Soton: eprints@soton.ac.uk

ePrints Soton supports OAI 2.0 with a base URL of http://eprints.soton.ac.uk/cgi/oai2

This repository has been built using EPrints software, developed at the University of Southampton, but available to everyone to use.

We use cookies to ensure that we give you the best experience on our website. If you continue without changing your settings, we will assume that you are happy to receive cookies on the University of Southampton website.

×