An assessment of virtual integration for passenger rail
An assessment of virtual integration for passenger rail
Vertical integration was introduced in the British railway system in the form of a virtual alliance between Network Rail (NR) and South West Trains (SWT). The introduction of this alliance in 2012 was due to the Rail Value for Money Study that was published by McNulty in 2011. However, this alliance was ended in 2015, which was two years earlier than initially agreed by the Department for Transport (DfT). This paper aims to investigate whether the performance quality, in terms of punctuality and reliability, was a reason to end this alliance. The investigation is based on a comparison of the performance quality of SWT with other comparable Train Operating Companies (TOCs), which are Govia Thameslink Railway (GTR) and Southeastern (SE). Furthermore, the measurements of the Public Performance Measures (PPM) and Cancellation and Significant Lateness (CaSL) of these TOCs were used to deliver the comparisons. As a result, the investigation indicated that punctuality and reliability are not influenced by whether the organisation is vertically separated or virtually integrated. Overall, the virtual integration in this case does not seem to have had an impact, on the overall performance quality of passenger rail services provided by SWT.
39-58
Preston, Jonathan
ef81c42e-c896-4768-92d1-052662037f0b
Alsaedi, Sultan, Salem A
3d7796ee-3adc-4287-ad9b-b47fd8724dd8
17 June 2019
Preston, Jonathan
ef81c42e-c896-4768-92d1-052662037f0b
Alsaedi, Sultan, Salem A
3d7796ee-3adc-4287-ad9b-b47fd8724dd8
Preston, Jonathan and Alsaedi, Sultan, Salem A
(2019)
An assessment of virtual integration for passenger rail.
In RailNorrköping 2019: 8th International Conference on Railway Operations Modelling and Analysis (ICROMA), Norrköping, Sweden, June 17th – 20th, 2019.
vol. 69,
Linköping University.
.
Record type:
Conference or Workshop Item
(Paper)
Abstract
Vertical integration was introduced in the British railway system in the form of a virtual alliance between Network Rail (NR) and South West Trains (SWT). The introduction of this alliance in 2012 was due to the Rail Value for Money Study that was published by McNulty in 2011. However, this alliance was ended in 2015, which was two years earlier than initially agreed by the Department for Transport (DfT). This paper aims to investigate whether the performance quality, in terms of punctuality and reliability, was a reason to end this alliance. The investigation is based on a comparison of the performance quality of SWT with other comparable Train Operating Companies (TOCs), which are Govia Thameslink Railway (GTR) and Southeastern (SE). Furthermore, the measurements of the Public Performance Measures (PPM) and Cancellation and Significant Lateness (CaSL) of these TOCs were used to deliver the comparisons. As a result, the investigation indicated that punctuality and reliability are not influenced by whether the organisation is vertically separated or virtually integrated. Overall, the virtual integration in this case does not seem to have had an impact, on the overall performance quality of passenger rail services provided by SWT.
This record has no associated files available for download.
More information
Accepted/In Press date: 17 June 2019
Published date: 17 June 2019
Venue - Dates:
8th International Conference on Railway Operations Modelling & Analysis, , Norrkoping, Sweden, 2019-06-17 - 2019-06-20
Identifiers
Local EPrints ID: 440741
URI: https://eprints.soton.ac.uk/id/eprint/440741
PURE UUID: ee16fa7a-93b6-4845-97cd-a5ba389832ad
Catalogue record
Date deposited: 14 May 2020 16:48
Last modified: 10 Nov 2026 02:43
Export record
Contributors
Author:
Sultan, Salem A Alsaedi
Download statistics
Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.
View more statistics