The University of Southampton
University of Southampton Institutional Repository

Optimizing household waste recycling centre network reorganization in Hampshire

Optimizing household waste recycling centre network reorganization in Hampshire
Optimizing household waste recycling centre network reorganization in Hampshire
Local councils across the UK are facing sustained financial pressures, and Household Waste Recycling Centres (HWRCs) are being increasingly considered for closure to reduce expenditure. In 2024, Hampshire County Council, which operates the largest HWRC network in the UK, proposed closing either five or twelve existing sites. These plans represented reductions of (Formula presented.) £0.5 million and £1.6 million per year, respectively, to meet medium-term budget targets. We analyze these proposals using a quadratic optimization model originally developed for Bavaria by applying it to Hampshire's network with postcode-level population, travel-patterns, and capacity estimates. Across three closure scenarios considered by the Council, we identify closure sets that surprisingly differ by only one facility, yet yield substantially improved performance: peak utilization falls by 40–60 percentage points, overloads are eliminated, and 90% of residents remain within 6.2 miles (five closures) or 9.6 miles (twelve closures) of an HWRC. Notably, the optimal closure sets form a strictly nested sequence enabling a stable multiyear closure path without policy reversals. Finally, we identify three regimes of network behavior that quantify when resident access and facility utilization remain resilient and when the network becomes structurally unstable: low-impact (0–4 closures), manageable (5–12), and fragile (beyond 12). Overall, our results demonstrate how established optimization methods can provide rigorous, data-driven support for ongoing HWRC reorganization under UK-wide fiscal pressure.
capacity-constrained networks, demand reallocation, facility closure, network consolidation, spatial accessibility
1097-0037
313-330
Jaidee, Montree
964fafa5-5dc4-434b-a19d-669b9e32b2ef
Sun, Zheng
ff0642f1-e435-4f99-86f1-b83f8153a73c
Singh, Sher
08eeeb50-7890-4a5e-a86b-995d6cf0bee5
Nguyen, Thi
af36b357-a0f5-4aa1-af41-7ce48afce6ff
Singh, Bismark
9d3fc6cb-f55e-4562-9d5f-42f9a3ddd9a1
Jaidee, Montree
964fafa5-5dc4-434b-a19d-669b9e32b2ef
Sun, Zheng
ff0642f1-e435-4f99-86f1-b83f8153a73c
Singh, Sher
08eeeb50-7890-4a5e-a86b-995d6cf0bee5
Nguyen, Thi
af36b357-a0f5-4aa1-af41-7ce48afce6ff
Singh, Bismark
9d3fc6cb-f55e-4562-9d5f-42f9a3ddd9a1

Jaidee, Montree, Sun, Zheng, Singh, Sher, Nguyen, Thi and Singh, Bismark (2026) Optimizing household waste recycling centre network reorganization in Hampshire. Networks, 88 (3), 313-330. (doi:10.1002/net.70056).

Record type: Article

Abstract

Local councils across the UK are facing sustained financial pressures, and Household Waste Recycling Centres (HWRCs) are being increasingly considered for closure to reduce expenditure. In 2024, Hampshire County Council, which operates the largest HWRC network in the UK, proposed closing either five or twelve existing sites. These plans represented reductions of (Formula presented.) £0.5 million and £1.6 million per year, respectively, to meet medium-term budget targets. We analyze these proposals using a quadratic optimization model originally developed for Bavaria by applying it to Hampshire's network with postcode-level population, travel-patterns, and capacity estimates. Across three closure scenarios considered by the Council, we identify closure sets that surprisingly differ by only one facility, yet yield substantially improved performance: peak utilization falls by 40–60 percentage points, overloads are eliminated, and 90% of residents remain within 6.2 miles (five closures) or 9.6 miles (twelve closures) of an HWRC. Notably, the optimal closure sets form a strictly nested sequence enabling a stable multiyear closure path without policy reversals. Finally, we identify three regimes of network behavior that quantify when resident access and facility utilization remain resilient and when the network becomes structurally unstable: low-impact (0–4 closures), manageable (5–12), and fragile (beyond 12). Overall, our results demonstrate how established optimization methods can provide rigorous, data-driven support for ongoing HWRC reorganization under UK-wide fiscal pressure.

This record has no associated files available for download.

More information

Accepted/In Press date: 12 June 2026
e-pub ahead of print date: 23 June 2026
Published date: October 2026
Keywords: capacity-constrained networks, demand reallocation, facility closure, network consolidation, spatial accessibility

Identifiers

Local EPrints ID: 514330
URI: https://eprints.soton.ac.uk/id/eprint/514330
ISSN: 1097-0037
PURE UUID: 85cbc56b-af7d-47aa-bf35-1bad55eb1584
ORCID for Sher Singh: ORCID iD orcid.org/0009-0009-5937-9901
ORCID for Bismark Singh: ORCID iD orcid.org/0000-0002-6943-657X

Catalogue record

Date deposited: 17 Sep 2026 13:53
Last modified: 23 Sep 2026 02:27

Export record

Altmetrics

Contributors

Author: Montree Jaidee
Author: Zheng Sun
Author: Sher Singh ORCID iD
Author: Thi Nguyen
Author: Bismark Singh ORCID iD

Download statistics

Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.

View more statistics

Atom RSS 1.0 RSS 2.0

Contact ePrints Soton: eprints@soton.ac.uk

ePrints Soton supports OAI 2.0 with a base URL of https://eprints.soton.ac.uk/cgi/oai2

This repository has been built using EPrints software, developed at the University of Southampton, but available to everyone to use.

We use cookies to ensure that we give you the best experience on our website. If you continue without changing your settings, we will assume that you are happy to receive cookies on the University of Southampton website.

×