Cost optimization tools for advanced gas turbine technologies

Cost optimization tools for advanced gas turbine technologies
Cost optimization tools for advanced gas turbine technologies
This thesis presents two studies that illustrate how cost modelling can be integrated into the various design process stages, ranging from strategic gas turbine and airframe system design to preliminary and detailed component design and production planning. The first study investigates which cruise speed the next generation of short-haul aircraft with 150 seats should fly at and whether a conventional two- or three-shaft turbofan, a geared turbofan, a turboprop or an open rotor should be employed in order to make the aircraft's direct operating cost robust to uncertain fuel and carbon (CO2) prices in the Year 2030, taking the aircraft productivity, the passenger value of time and the modal shift into account. To answer this question, an optimization loop was set up in MATLAB consisting of nine modules covering gas turbine and airframe design and performance, light and aircraft fleet simulation, operating cost and optimization. If the passenger value of time is included, the most robust aircraft design is powered by geared turbofan engines and cruises at Mach 0.80. If the value of time is ignored, however, then a turboprop aircraft flying at Mach 0.70 is the optimum solution. This demonstrates that the most fuel-efficient option, the open rotor, is not automatically the most cost-efficient solution because of the relatively high engine and airframe costs. The second study shows how a factory cost model can be combined with a parametric component production time model, to not only calculate costs at the manufacturing operation level for production planning, but also the total unit costs of future integrally bladed disc (blisk) designs for component trade-off studies. As future process times can only be estimated and the correlation between operation times and blisk design parameters, including the number of blades, the disc diameter and other design variables, is never perfect, all operation times have uncertainty distributions. These are cascaded through the model to generate a probability distribution of the unit cost.
Langmaak, Stephan
0be237c1-5f10-4645-99a3-fa274c3939c9
Langmaak, Stephan
0be237c1-5f10-4645-99a3-fa274c3939c9
Scanlan, James
7ad738f2-d732-423f-a322-31fa4695529d

Langmaak, Stephan (2015) Cost optimization tools for advanced gas turbine technologies. University of Southampton, Engineering and the Environment, Doctoral Thesis, 201pp.

Record type: Thesis (Doctoral)

Abstract

This thesis presents two studies that illustrate how cost modelling can be integrated into the various design process stages, ranging from strategic gas turbine and airframe system design to preliminary and detailed component design and production planning. The first study investigates which cruise speed the next generation of short-haul aircraft with 150 seats should fly at and whether a conventional two- or three-shaft turbofan, a geared turbofan, a turboprop or an open rotor should be employed in order to make the aircraft's direct operating cost robust to uncertain fuel and carbon (CO2) prices in the Year 2030, taking the aircraft productivity, the passenger value of time and the modal shift into account. To answer this question, an optimization loop was set up in MATLAB consisting of nine modules covering gas turbine and airframe design and performance, light and aircraft fleet simulation, operating cost and optimization. If the passenger value of time is included, the most robust aircraft design is powered by geared turbofan engines and cruises at Mach 0.80. If the value of time is ignored, however, then a turboprop aircraft flying at Mach 0.70 is the optimum solution. This demonstrates that the most fuel-efficient option, the open rotor, is not automatically the most cost-efficient solution because of the relatively high engine and airframe costs. The second study shows how a factory cost model can be combined with a parametric component production time model, to not only calculate costs at the manufacturing operation level for production planning, but also the total unit costs of future integrally bladed disc (blisk) designs for component trade-off studies. As future process times can only be estimated and the correlation between operation times and blisk design parameters, including the number of blades, the disc diameter and other design variables, is never perfect, all operation times have uncertainty distributions. These are cascaded through the model to generate a probability distribution of the unit cost.

Text
Final thesis.pdf - Other
Download (6MB)

More information

Published date: August 2015
Organisations: University of Southampton, Computational Engineering & Design Group

Identifiers

Local EPrints ID: 388048
URI: http://eprints.soton.ac.uk/id/eprint/388048
PURE UUID: c3f222b2-4ef3-4a96-80dd-6427be1dd25b

Catalogue record

Date deposited: 18 Feb 2016 13:44
Last modified: 14 Mar 2024 22:51

Export record

Contributors

Author: Stephan Langmaak
Thesis advisor: James Scanlan

Download statistics

Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.

View more statistics

Atom RSS 1.0 RSS 2.0

Contact ePrints Soton: eprints@soton.ac.uk

ePrints Soton supports OAI 2.0 with a base URL of http://eprints.soton.ac.uk/cgi/oai2

This repository has been built using EPrints software, developed at the University of Southampton, but available to everyone to use.

We use cookies to ensure that we give you the best experience on our website. If you continue without changing your settings, we will assume that you are happy to receive cookies on the University of Southampton website.

×