The University of Southampton
University of Southampton Institutional Repository

The need for greater transparency when assessing the performance and prospects of Melbourne’s rail franchise contracts

The need for greater transparency when assessing the performance and prospects of Melbourne’s rail franchise contracts
The need for greater transparency when assessing the performance and prospects of Melbourne’s rail franchise contracts
Among policymakers and researchers at an international level, there is great interest in the performance of the Melbourne rail franchise model. This review attempts to examine the Melbourne model in an international context and assess the performance of the system under current contracts. Potential flaws are highlighted including lack of information, concerns over performance and contestability, and the treatment of the potential long-term maintenance backlog under short-term contracts. The authors conclude with an overall stance of there needing to be far greater public information transparency to allow proper scrutiny of the effectiveness of these contracts for the public good.

国际上的决策者和研究者都对墨尔本轨道运营模式的绩效表现出很大的兴趣。本综述试图将墨尔本模式放在国际语境中加以审视,并评估其目前的运营绩 效。综述突出了潜在缺陷,如信息缺乏、对绩效和竞争性的担忧,以及短期 合同可能对长期维护造成问题。作者指出,从总体上看,墨尔本模式需要大 大提高其信息透明性,以便对合同效益进行恰当的监督,保障公众利益。
82-96
Ashmore, David Patrick
414351fb-6bb8-4836-ba51-c6271c39b932
Stone, John
88f8724b-9ed9-4bcd-992f-a80adaafe626
Kirk, Yvonne
1dab1c1f-0589-4dea-8faa-f51a49d3fe72
Ashmore, David Patrick
414351fb-6bb8-4836-ba51-c6271c39b932
Stone, John
88f8724b-9ed9-4bcd-992f-a80adaafe626
Kirk, Yvonne
1dab1c1f-0589-4dea-8faa-f51a49d3fe72

Ashmore, David Patrick, Stone, John and Kirk, Yvonne (2019) The need for greater transparency when assessing the performance and prospects of Melbourne’s rail franchise contracts. Urban Policy and Research, 37 (1), 82-96. (doi:10.1080/08111146.2018.1486296).

Record type: Article

Abstract

Among policymakers and researchers at an international level, there is great interest in the performance of the Melbourne rail franchise model. This review attempts to examine the Melbourne model in an international context and assess the performance of the system under current contracts. Potential flaws are highlighted including lack of information, concerns over performance and contestability, and the treatment of the potential long-term maintenance backlog under short-term contracts. The authors conclude with an overall stance of there needing to be far greater public information transparency to allow proper scrutiny of the effectiveness of these contracts for the public good.

国际上的决策者和研究者都对墨尔本轨道运营模式的绩效表现出很大的兴趣。本综述试图将墨尔本模式放在国际语境中加以审视,并评估其目前的运营绩 效。综述突出了潜在缺陷,如信息缺乏、对绩效和竞争性的担忧,以及短期 合同可能对长期维护造成问题。作者指出,从总体上看,墨尔本模式需要大 大提高其信息透明性,以便对合同效益进行恰当的监督,保障公众利益。

This record has no associated files available for download.

More information

Accepted/In Press date: 4 June 2018
e-pub ahead of print date: 3 July 2018
Published date: 2 January 2019

Identifiers

Local EPrints ID: 493518
URI: http://eprints.soton.ac.uk/id/eprint/493518
PURE UUID: a5955bd7-4da0-4c1d-b900-a2dacead4a2b
ORCID for David Patrick Ashmore: ORCID iD orcid.org/0000-0002-1649-1962

Catalogue record

Date deposited: 05 Sep 2024 16:31
Last modified: 06 Sep 2024 02:10

Export record

Altmetrics

Contributors

Author: David Patrick Ashmore ORCID iD
Author: John Stone
Author: Yvonne Kirk

Download statistics

Downloads from ePrints over the past year. Other digital versions may also be available to download e.g. from the publisher's website.

View more statistics

Atom RSS 1.0 RSS 2.0

Contact ePrints Soton: eprints@soton.ac.uk

ePrints Soton supports OAI 2.0 with a base URL of http://eprints.soton.ac.uk/cgi/oai2

This repository has been built using EPrints software, developed at the University of Southampton, but available to everyone to use.

We use cookies to ensure that we give you the best experience on our website. If you continue without changing your settings, we will assume that you are happy to receive cookies on the University of Southampton website.

×